Contact form

Contact Form (Conditions: Gas, electricity, phone)

Contactdata/ General interest (Contact-Flap)
What is your interest?
Product-Section (Contact-Flap)
Gas supply informations (Contact Flap Options)
Your annual consumption
Your sites
Electrcity supply informations (Contact Flap Options)
Your annual electricity consumption
Your sites
Submit (Contact-Flap)

Clean-up of the Bisse Roux

  • Project initiators: Municipality of Anniviers, PATRICK EPINEY Ingénieur Sàrl
  • Description: Refilling of the bisse in order to irrigate agricultural areas, intercept runoff, manage torrent flows, limit flood risks and provide an additional solution in case of fires.
  • Contact: infomail@patrickepineyweb.ch

Better sustainable management of drinking water

  • Project initiators: Municipalities of Anniviers, St-Martin and Törbel, HES-SO Valais Wallis
  • Description: Survey and mapping of existing drinking water sources and development of a monitoring tool to provide an overview of water resources, analyse their use, optimise their management and identify energy potential. 
  • Contact: stephane.genoudmail@hevsweb.ch

WalliserSchiäber

  • Project initiators: Municipalities of Ausserberg and Eischoll, Stahleinbau GmbH and Imboden Elektromechanik AG
  • Description: With the new "WalliserSchiäber" system, the operation of the valves is fully automated. The time and effort required is considerably reduced thanks to a remote control system. A solar cell stores the necessary control energy in a battery. This guarantees the operation of the valve for several days, even in bad weather. For more information: www.walliserschiäber.ch
  • Contact: brunner.ninomail@stahleinbauweb.ch

Water regulation

  • Project initiators: Municipality of Zwischbergen 
  • Description: Control and automation of the water flow by means of electronic valves between the Zwischbergen and Gondo reservoirs in order to optimise water management and reduce water consumption.
  • Contact: gemeindemail@gondoweb.ch

Preliminary study on the efficient management of water resources for agricultural use on a regional scale

  • Project initiators: Municipalities of Chalais, Chippis, Grône and Sierre, PATRICK EPINEY Ingénieur Sàrl
  • Description: Inventory of current irrigation and identification of the best irrigation equipment to allow: efficient and rational water management, optimisation of water consumption, reduction of losses and wastage and preservation of aquatic environments.
  • Contact: infomail@patrickepineyweb.ch

Vallon de Barme – installation of a drinking water treatment system

  • Project initiators: Municipality of Champéry, Association for the protection and development of the Barme valley
  • Description: Installation of a filter (slow sand filtration - KLS® technology) and a tank to purify the water of the hamlet of Barme. The aim is to allow the many visitors to enjoy nature without harming the environment or their health.
  • Contact: contactmail@vallondebarmeweb.com

Vorthy

  • Project initiators: Municipality of Dorénaz, Romain Lugon
  • Description: Production of hydroelectric energy from the Rhône with the installation of a micro plant (with a 300 kW Vortex turbine) in order to provide direct energy to the municipality, while preserving the environment.
  • Contact: lurmail@hydro-exploitationweb.ch

Combioula thermal water

  • Project initiators: Municipality of Hérémence, mjd architectes SA
  • Description: Water from the Combioula aquifer is the key resource for the energy (district heating and turbines) and thermal (baths and treatments) operations of the entire Dixence Resort hotel and residential complex.
  • Contact: jean-daniel.massereymail@mjdweb.ch

Turbining of irrigation water from the Combe de l'A

  • Project initiators: Municipality of Liddes, Dransenergie SA
  • Description: Construction of a water intake, a penstock to the current reservoir, and then a turbine room (using the fall imposed by the place of abstraction) in order to meet the irrigation needs of the municipality.
  • Contact: administrationmail@liddesweb.ch
    james.derivazmail@dransenergieweb.ch

Phyto ZERO

  • Project initiators: Municipality of Riddes, RedElec Technologie SA, NVTerra SA
  • Description: Innovative electrochemical water treatment technology to improve the pre-treatment of phytosanitary residues in farmers' machinery washing stations. The objective is zero discharge of pollutants and limited use of chemical products. 
  • Contact: infomail@redelecweb.ch

UVC – a resource-saving alternative to pesticides

  • Project initiators: Municipality of Salgesch, Aquanetto Group GmbH
  • Description: Innovative vineyard treatment with a fungicide-free UV-C irradiation system to protect the water from undesirable inputs related to the use of plant protection products. System adapted to the topography of the Valais vineyards. 
  • Contact: guidal.kohlermail@gmailweb.com; www.aquanetto.ch

FISHLAB-CH

  • Project initiators: Municipality of Sion, Corealis sàrl
  • Description: In order to assess the effects of climate change, development of a standardised observation network of fish flows in various Swiss rivers using innovative technology that respects the fauna and allows for significant data acquisition.
  • Contact: damien.sidlermail@corealisweb.ch

BONNALTIS

  • Project initiators: Municipality of Val de Bagnes, ALTIS Groupe SA
  • Description: Construction of a mini waste water treatment plant for the hamlet of Bonatchiesse, required for compliance with the renovation of mayens. This measure supports the maintenance of the hamlet while respecting water protection requirements.
  • Contact: alexandre.gilliozmail@altisweb.swiss

Revitalisation of the lowland irrigation channels in Vétroz

  • Project initiators: Municipality of Vétroz, PATRICK EPINEY Ingénieur Sàrl
  • Description: Reopening of lowland irrigation channels to irrigate agricultural areas, to feed future water bodies, to create plantations and structures supporting biodiversity.
  • Contact: olivier.cottagnoudmail@vetrozweb.ch; infomail@patrickepineyweb.ch

Drinking water and irrigation water MZS Gornerli

  • Project initiators: Municipality of Zermatt
  • Description: Assessing the possibility of using a reservoir (as part of the MZS Gornerli project – multifunctional reservoir project downstream of the Gorner glacier) to meet the future drinking water and irrigation needs of the Matter and Visp valleys.
  • Contact: romy.binermail@zermattweb.ch